By Bob Heiderscheidt, President and CEO, MDI Access
Through Q3 2026, industrial leasing tied to data centers reached 50 million square feet. According to new research from Cushman & Wakefield, that is 113% more than in all of 2025. Total new industrial leasing grew 21% over the same stretch.
The numbers point to something bigger than a leasing trend. Every data center campus now pulls a supply chain in around it, and that supply chain needs buildings. For owners of existing industrial property near data center hubs, that creates new options. For developers, it makes adaptive reuse more valuable than it was a year ago.
The campus is bigger than the fence line
The U.S. has more than 47 GW of operational data center capacity and another 36 GW under construction. Each campus depends on a steady flow of servers, networking gear, power equipment, cooling systems and spare parts. Cushman & Wakefield reports that year-to-date U.S. imports of AI-related equipment and components are up 62% to $659 billion.
Three tenant groups are driving the industrial demand that follows:
- Equipment and component manufacturers are expanding distribution in key hubs so they can deliver racks, storage and parts faster.
- Construction and building suppliers are staging materials for campuses in development. They made up 30% of year-to-date leasing volume.
- Third-party logistics providers are signing long-term contracts with hyperscalers. Their data center-related leasing reached nearly 11 million square feet this year.
The effect is concentrated where capacity is. In Phoenix, Columbus, Kansas City, Northern Virginia and Dallas-Fort Worth, data center-related users account for 22% to 41% of this year's industrial leasing. Emerging markets including Kansas City, Reno, Austin-San Antonio and West Texas saw combined data center-related leasing jump 274%.
Why this raises the stakes for adaptive reuse
Existing industrial buildings in data center markets now have more than one valuable future. Cushman & Wakefield expects new industrial supply to stay modest in the near term, so the buildings already standing near data center hubs are the ones in play.
That gives owners and developers two paths worth evaluating:
- Convert the building into a data center. Many industrial buildings offer large open floor plates, high clear heights and room for heavy equipment. With the right power, fiber and structural profile, they can become colocation, edge or inference capacity on a faster path than a ground-up build. I made the broader case for this in The Best Data Center Site May Already Be Standing.
- Position the building as campus support space. Manufacturers, suppliers and 3PLs serving nearby campuses need storage, staging and distribution space close to the sites they support. A well-located building can capture that demand as it stands, or with targeted upgrades.
The right answer depends on the building and the market. Power availability, structural capacity, zoning and proximity to active campuses all shape which path delivers more value. Making that call early matters, because data center-related tenants often know where new campuses will go before ground is broken, and they are already securing space.
Four moves for owners and developers now
- Map your buildings against the campus pipeline. Columbus, Phoenix, Atlanta and Dallas-Fort Worth each have more than 3,500 MW of operational or planned data center capacity. Proximity to that pipeline is now a core part of an industrial building's value.
- Assess conversion potential before you lease. A facility condition assessment and technical due diligence show whether power, structure and cooling can support data center use. Signing a long-term logistics lease first can lock in the lower-value path for years.
- Run the numbers on both paths. A feasibility study comparing conversion against support-space leasing gives owners a clear basis for the decision.
- Watch the emerging markets. El Paso, Portland and Salt Lake City posted notable data center-related industrial demand for the first time this year. The next wave of opportunity is forming beyond the established hubs.
Know what your building could become
MDI has spent more than three decades turning buildings that were never designed as data centers into ones that perform like they were, from a REIT-owned shell phased to 3MW in Milwaukee to nine single-floor deployments inside Chicago high-rises. Our site selection, technical due diligence, facility condition assessments and feasibility studies give owners a clear view of a building's potential before they commit to a path.
If you own or are evaluating industrial property in a data center market, the question is worth asking now.
Talk to an Advisor about your building's potential.
Sources
- Jason Price, "Data Centers: The Newest Logistics Demand Engine," Cushman & Wakefield, 2026: https://www.cushmanwakefield.com/en/united-states/insights/data-centers-the-newest-logistics-demand-engine